Plumber invoice template
Service calls, installs, parts, permits, and warranty notes
Residential service plumbers, commercial maintenance plumbers, and new-construction crews do not bill the same way. List the trip charge, labor, marked-up parts, emergency premium and permit fee as separate lines, with the warranty in the terms.
Create your plumbing invoiceWhat plumbing bills need
Service call + parts + labor
Show the trip charge, parts at retail, and labor as separate lines instead of hiding them in one total.
Flat-rate or hourly per job
Book-price flat-rate for diagnosable jobs; time-and-materials for open-scope work like slab leaks. A flat-rate job is one line at quantity 1; hourly work is hours times your rate.
Emergency premiums itemized
After-hours, weekend, and holiday premiums shown as separate line items so the customer knows what's elevated.
Warranty and permit fees
Put your standard warranty language in the terms; pass permit fees through at cost as their own line.
Common plumbing jobs
- Residential service plumbers
- Drain clearings, water-heater replacements, fixture repairs, leak diagnosis, billed at completion with parts and labor.
- New construction & remodel
- Multi-phase plumbing rough-in, fixtures, and final connections billed in milestones with permits.
- Commercial plumbing maintenance
- Property-management contracts with monthly retainers and per-unit billing for repairs.
- Specialty plumbing
- Hydro-jetting, sewer-line replacement, slab-leak detection, typically T&M with diagnostic fees.
Plumber invoice FAQ
- What should a plumber's invoice include?
- Service call fee (or trip charge), labor (hourly or flat-rate), parts with markup, any emergency/after-hours premium, warranty terms, and inspection notes. Residential customers expect to see the diagnosis ("replaced kitchen-sink P-trap; corroded threads"), parts itemized, and labor time. Commercial property managers prefer flat-rate billing with one consolidated description.
- Hourly vs flat-rate billing, which is better?
- Flat-rate (book pricing from Profit Rhino, Service Titan, or your own price book) wins on most service calls because the customer knows the cost upfront. Hourly works for unknown-scope work (slab leaks, sewer line repairs, multi-day remodels). Many plumbers use both: flat-rate for diagnosable jobs, T&M for digging or anything that turns out worse than expected once opened.
- How much can I mark up parts?
- Plumbing parts are usually marked up 30–100% over wholesale, with 50% a common middle. Some markets and parts justify more (specialty fixtures, low-volume manufacturer parts) and some less (PVC/CPVC, basic fittings, high-volume items where cost is well-known). State the part description and price on the invoice; customers don't need to see your wholesale cost, but they want to see what part was used.
- How do I handle emergency / after-hours calls?
- Standard premium structures: 1.5x labor for evenings/weekends, 2x for overnight (10pm-6am) and major holidays. Some plumbers charge a flat "emergency dispatch fee" ($150-$300) on top of regular rates. Whatever your structure, list the premium as its own line item ("After-hours premium (+50% labor)") so the customer sees what's elevated and why.
- Should I include a warranty on the invoice?
- Yes, every time. State both the parts warranty (typically the manufacturer's 1-year residential warranty) and the labor warranty (commonly 30-90 days for service work, 1 year for installations). Specify what voids it (DIY repair, freezing, abuse). A clear warranty statement reduces callback disputes and signals professionalism. Put it in the terms section.
- Do plumbers charge sales tax?
- Depends on your state. Most states tax materials but not labor on residential repair work. Some states tax both for new construction. Texas, for example, doesn't tax labor on residential repair but taxes the full charge on nonresidential repair, and materials are taxable on a separated contract. California exempts most labor on residential repair. Issueable supports two tax lines (state + city), and both apply to the whole invoice, so where labor is exempt, bill parts and labor on separate invoices.
- How should I document permits and inspections?
- List permits as a discrete line item with the actual fee ("Building permit per City of [X]: $187, at cost"). For inspection-required work, note in the terms that work is contingent on passing final inspection. If the customer is pulling the permit themselves (sometimes the case for owner-builder situations), state explicitly: "Permit pulled by owner." Permit confusion is a common source of post-job disputes; be explicit.
- When should I require payment, at the job site or via invoice?
- Service calls: payment at completion, before leaving (cash, check, card via Square or Stripe Reader). Larger installations and remodels: deposit at scheduling, progress payments, final payment on completion. Long-tail commercial customers can be invoiced net-30, but require a signed work authorization first. Issueable supports both flows. Issue at-job invoices on a phone for service work, or formal multi-line invoices for installations.
How plumbers bill
A plumber's invoice has to explain a lot in a small space: what was diagnosed, which parts were swapped, what warranty applies, and why an after-hours rate was charged. When those details are visible, the customer can follow the bill without turning the payment conversation into a second service call.
Drain specialists, water-heater installers, sewer-line crews, gas-line plumbers, and irrigation pros all use the same invoice shape. For jobs that cross into electrical or HVAC, see the electrician invoice template and the general contractor template for coordinating multi-trade bills.
Related guides
Invoice the job before you leave
Build the invoice on your phone, preview the PDF, then pay only when it is ready to send.
Create invoice now